Milliken® Vis Divide: Directional Drilling

Vis Divde was placed onsite using the directional drilling method. The bore and fiber install took place over a two week span since the ducts needed to be in place before the cable installation. The Vis Divide was coupled at 540’ to the 100’ section via a standad HDPE coupling .

READ MORE



See Vis Divide installed using horizontal directional drilling on a corporate campus in Arkansas.