Milliken® Vis Divide: Directional Drilling (2 Conduits)

When GVTC in Gonzales, TX needed to pull fiber to a new construction site, they chose VisTM Divide for the job.

   

READ MORE

See a double pull (2 conduits simultaneously) of Vis Divide segmented conduit pulled to a new construction site in Texas.